Show Navigation
All Galleries
Download

Construction

31 images Created 12 Jan 2016

Loading ()...

  • Bree Smith, a journeyman ironworker with Local 29, celebrates after topping out the Knight Cancer Research Building on Monday.
    01_KCRB_Iron.jpg
  • Thad Hanson, an electrician with Tradesmen Electric, routes wiring at Grant Park Village Phase II, a 167-unit apartment building under construction in Northeast Portland.
    02_GPV_Electrician.jpg
  • Caleb Simonds, a laborer with Local 737 and employee of Bremik Construction, directs concrete while pouring the ninth floor deck of a new affordable housing development in the Pearl District.
    03_14th_Raleigh_Pour.jpg
  • Justin Kuykendall, an ironworker with Erectors, Inc., prepares to weld bridging onto a bar joist at the Oregon Rail Heritage Center in Southeast Portland May 18. General contractor Lorentz Bruun began work on the Hennebery Eddy-designed project in November, and expect to be finished in July.
    04_Rail_Museum.jpg
  • NWR Construction employee Chad Case chips out old pieces of masonry in preparation for reframing a window.
    05_Erickson_Fritz_Mason.jpg
  • Amy Miller, an employee of Eagles View Construction II, welds embed clamps at a self-storage facility under construction in Southeast Portland.
    06_Self_Storage_Welder.jpg
  • Shannon Wilson, a carpenter with Western Wood Structures and journeyman member of Local 1503, nails plywood to the inclined roof truss on PCC Sylvania's College Center building. Howard S. Wright is the general contractor on a bond-funded project to construct a new GBD Architects-designed entrance to the building.
    07_PCC_Sylvania.jpg
  • Ethan Soelberg, a welder with Madden Fabrication, builds a skylight frame atop the Fritz building.
    08_Erickson_Fritz_Welder.jpg
  • James Fenson, a carpenter with Wood Mechanix, cuts material while doing framing pick-up work on the 72/Foster affordable housing development.
    09_72_Foster.jpg
  • Journeyman ironworker Bree Smith works steadies a beam as the other end is secured while erecting the steel structure of the Knight Cancer Research Building in southwest Portland.
    10_KCRB_Iron_2.jpg
  • Crews with Prairie Electric install conduit in the future gymnasium of Faubion School in Northeast Portland.
    11_Faubion.jpg
  • Dennis Cacen pets his Jack Russell terrier, Clairbelle, as he climbs into the cab of an excavator while working in Northeast Portland on Tuesday.  Cacen, a superintendent for Eugene-based Brown Contracting, has been bringing 14-year-old Clairbelle to work with him since she was a puppy.
    12_Dog_on_the_Job.jpg
  • 13_Industrial_Home.jpg
  • Eddy Acosta, a mason with D&R Masonry Restoration, carries sand up a ladder while working on a balcony resurfacing job at the Lexington Apartments in downtown Portland Monday.
    14_Climbing_Ladder.jpg
  • Jorge Rodrighez, a welder with Royal Oak Metal Craft, welds a hand rail to a stair stringer.
    15_Storage_Welder.jpg
  • Darren Anstine, a journeyman laborer with RDF Builders and a member of Local 737, rolls out protective covering on a fifth-floor hallway.
    16_GPV_Silhouette.jpg
  • Rob Kalleck, an ironworker with Northwest Structural Services, lines up pan decking on a mixed-use structure at Northwest 23rd Avenue and Glisan Street that is being rebuilt after sustaining major damage in an October 2016 gas explosion.
    17_23rd_Glisan_01.jpg
  • 18_Light_Rail_Welding.jpg
  • Lonnie Land, a crane operator with IUOE Local 701, climbs down from a crane at the end of a shift at The Emery, a 118-unit mixed-use apartment building being built by Lease Crutcher Lewis on Southwest Moody Avenue. The seven-story building, designed by ZGF Architects, is the first redevelopment project on land owned by the Zidell family in the South Waterfront.
    19_Crane_Operator.jpg
  • Jose Saucedo, a carpenter with Wood Mechanix, installs exterior framing on the Redfox Commons adaptive reuse project. Existing old-growth timber has been sandblasted and kept in place as possible, and will be enveloped by new framing and a new truss roof installed over the existing one.
    20_Redfox_Commons_03.jpg
  • Kyle Stewart, an ironworker with Rebar International and journeyman member of Local 29, attaches crosshole sonic logging tubes to a rebar cage, which will serve as a from for a support shaft for the Portland-Milwaukie Light Rail Bridge, in Portland's South Waterfront on Thursday.
    21_PMLRB.jpg
  • John Morris, a carpenter with RDF Builders and member of Local 156, communicated with a tower crane operator after rigging a load of electrical material at the Grant Park Village development in Northeast Portland.
    22_Grant_Park_Village_01.jpg
  • Crews with Lease Crutcher Lewis installed a roof made of cross-laminated timber Tuesday on a new building at the Oregon Zoo, marking the first use of the material in the state. A total of seven panels, measuring about eight feet wide and with a thickness of 5 ½ inches, were lifted into place atop a visitor center under construction as part of the zoo’s new Elephant Lands exhibit.
    23_Zoo_CLT_Install.jpg
  • Travis Jackson, an employee of Whitaker Ellis and apprentice carpenter with Local 156, installs formwork at the site of the Blanchet House of Hospitality project in downtown Portland on Wednesday.  General contractor Fortis Construction is building a new four-story facility, which will include a first-floor kitchen and dining area and three floors of residential space.
    24_Blanchett_House.jpg
  • 25_Cigarette_Guy.jpg
  • Terrel Cage, a carpenter with CLP Resources, sands water stains out of a glue-laminated beam.
    26_Sanding.jpg
  • 27_PAW_Rebar.jpg
  • Journeyman carpenter John Huddleston, an employee of Bremik Construction and member of Local 156, puts a sheath over a form tie while working on the NW 6th & Couch Apartment Development Friday morning.
    28_Rebar_Wall.jpg
  • Nate Hinton, a heavy equipment operator with Valley Pacific Construction, clears debris from the site of a CarMax used vehicle dealership in Milwaukie.
    29_CarMax.jpg
  • NAWIC National Vice President Yasmine Branden, an employee of Neil Kelly Company, Inc., drives a screw while constructing a porch railing.
    30_NAWIC.jpg
  • Ironworker Jess Ross reaches out to guide a beam into place while erecting the steel structure portion of OHSU's Knight Cancer Research Building in Portland's South Waterfront district.
    31_KCRB_Iron_03.jpg
View: 100 | All
  • Facebook
  • Twitter
x

Sam Tenney Photography

  • Portfolio
  • About
  • Contact
  • Archive
    • All Galleries
    • Search
    • Cart
    • Lightbox
    • Client Area